Completed Projects With Al Wakrah Hospital

Fabrication For Agss Pipe

Installation
Main Contractor: Mannai Trading
Sub Contractor: Shield Tech Trading

6 x Operation Theater

Integration
Main Contractor: Sadeer Medical
Sub Contractor: Shield Tech Trading

MEP Design & Build Works

Lithotripsy
Main Contractor: Al Danah Medical
Sub Contractor: Shield Tech Trading

Operation Theater Work

Installation
Main Contractor: Sadeer Medical
Sub Contractor: Shield Tech Trading